<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://sop.mse.mtu.edu/index.php?action=history&amp;feed=atom&amp;title=Wire_Drawing_Procedure</id>
	<title>Wire Drawing Procedure - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://sop.mse.mtu.edu/index.php?action=history&amp;feed=atom&amp;title=Wire_Drawing_Procedure"/>
	<link rel="alternate" type="text/html" href="http://sop.mse.mtu.edu/index.php?title=Wire_Drawing_Procedure&amp;action=history"/>
	<updated>2026-06-01T14:12:57Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.37.2</generator>
	<entry>
		<id>http://sop.mse.mtu.edu/index.php?title=Wire_Drawing_Procedure&amp;diff=249&amp;oldid=prev</id>
		<title>Gcanzalo: Copied from old</title>
		<link rel="alternate" type="text/html" href="http://sop.mse.mtu.edu/index.php?title=Wire_Drawing_Procedure&amp;diff=249&amp;oldid=prev"/>
		<updated>2022-05-24T19:19:01Z</updated>

		<summary type="html">&lt;p&gt;Copied from old&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt; [[Category: SOP]]&lt;br /&gt;
&lt;br /&gt;
=Saftey=&lt;br /&gt;
&lt;br /&gt;
==Loss Prevention==&lt;br /&gt;
&lt;br /&gt;
=Procedure=&lt;br /&gt;
# Acquire a 1 x 6 x 12” steel plate  [[File:wire_drawing_using_die.jpg|150px|thumb|right|Figure 4: Wire drawer jaws pulling wire out of die]]&lt;br /&gt;
# Machine plate in ¼ x 6” rods&lt;br /&gt;
# Using a FENN 76-5, slowly insert the rod through rotating swaging blocks, at approximately midway midway of rods length, slowly remove the rod and reproduce on the other half [[File:steel rod and swaging block.jpg|150px|thumb|right|Figure 1: ¼” Steel rod resting on half a swaging block ]]       &lt;br /&gt;
# Using that procedure, incrementally swage the rods from 1/4 “ to 0.140” swaging block diameter [[File:smaller swager operation.jpg|150px|thumb|right|Figure 3: Smaller swagger used to point head of a rod]]&lt;br /&gt;
# Using the {small swager name}, point the rod using 0.11”, 0.10” and 0.09” swaging block [[File:swager to reduce rod diameter.jpg|150px|thumb|right|Figure 2: Nate using big swagger to reduce diameter of the rod]]&lt;br /&gt;
# From there, insert the pointed head of the wire trough 0.1193” die and wire draw by clamping {Name wire drawing} jaws to the wire and draw&lt;br /&gt;
# Point and draw wire using decreasing diameters of swaging blocks and die and stop after 0.0802” diameter die&lt;br /&gt;
# Use hand pointer to reduce wire head diameter until it fits through {die that I missed} die then move to wire drawing&lt;br /&gt;
# Reproduce same procedure until after die 0.04021&lt;br /&gt;
# Anneal wire in furness for 30 minutes at 500℃&lt;br /&gt;
# Return to hand pointing and drawing till last die of 0.030” diameter [[File:final_wire_diameter.jpg|150px|thumb|right|Figure 6: 0.03” diameter wire at the end of procedure]]&lt;/div&gt;</summary>
		<author><name>Gcanzalo</name></author>
	</entry>
</feed>