Buehler Vibrometer I
Jump to navigation
Jump to search
Saftey
Loss Prevention
PPE
Procedure
Startup
- Check over the machine for unsafe conditions.
- Check that the four bolts attaching the basin to the machine are snug and secure.
- Check which basin you should be using. They should be labelled ductile iron or aluminum.
- For aluminum use the colloidal solution and wet the pad, For iron, also wet the pad but then put about a ¼ inch layer of water on top.
- NOTE: This machine is only meant to be used for the very final step of polishing.
Mounts
- Place the mount into the proper sample holder using the recessed holes in the mounting device.{A,B}
- Tighten the set screw only until the mount is firmly tight, not too far.
- Carefully place the sample holder along the outer edge of the basin. {C}
Operation
- After ensuring the vibration setting is set at 0, turn on the machine.
- Slowly adjust the vibration until the sample holder makes a revolution approximately every ten seconds.
- Wait 30-60 minutes, longer for harder materials.
Shutdown
- Once stopped, remove sample holder with sample.
- Place them both into the ultrasonic cleaner.
- Remove mount from holder.
- Remove basin assembly from machine by unscrewing the four hex head bolts. Immediately replace the bolts on the machine.
- Wash the basin assembly under the sink.
- Place in ziplock bag to maintain moisture.
- Clean the work area.